Trump administration officials said the U.S. Army appeared to have successfully prevented lead dust from escaping into the atmosphere on Wednesday morning after it blew up nearly five tons of lead explosives in Middletown, Iowa.
Live air monitors stationed near the Iowa Army Ammunition plant and along the projected path for a possible plume of lead dust did not detect lead, officials said.
The Washington Sun reviewed the EPA’s live air-quality monitoring data, which showed no lead detected by any of the monitors reporting data in the 45 minutes following the detonation. It’s still possible that lead could be present in very small quantities in the air, below the minimum detection threshold for the air monitors.
It’s also still possible that lead dust could have fallen to the ground in the area surrounding the Army Ammunition Plant. The Army has not issued an all-clear for those who evacuated.
Trending
“The Army’s controlled, mitigation detonation exceeded all expectations and was a HUGE success. The threat of an uncontrolled spontaneous detonation has been eliminated,” said Acting Army Secretary Adam Telle in a statement. “We are watching EPA’s MASSIVE sensor array throughout the area closely, and there are no readings so far about 0.0. To the people of Iowa, we are with you all the way. We will update the public with more information throughout the day.”
On CNN shortly after the detonation, EPA Administrator Lee Zeldin said he was told that mitigation efforts “exceeded expectations.” Zeldin said the EPA’s sensory array was reporting “nothing above 0.0" in airborne lead. “The lead levels are coming in so low it is equaling no detection,” Zeldin said
“It’s remaining zero detection and it looks like it caved inward perfectly,” Zeldin said, sharing a message he said he received from an EPA employee.
States that were in the potential hazard zone also said the federal government indicated that there was no longer a major risk of a lead dust plume.
“Initial analysis shared with us by federal partners and Iowa Homeland Security and Emergency Management indicates that the mitigation measures appear to have been successful and the explosion was well contained,” said Missouri Gov. Mike Kehoe in a statement after the explosion. Northeastern Missouri was within the projected possible lead dust plume in a map published by the Army before the explosion.
Many living in the path of the projected lead dust plume have evacuated and now are awaiting instructions from the Army to return to their homes.
The Army and the EPA, along with outside researchers, will be taking air and soil samples to measure if any lead dust remained in the air and where it may have fallen to the ground. The government has pledged to offer tests to anyone who wants them, and to remediate areas if lead concentrations are found to be above federally acceptable levels.
There is no safe level of lead to ingest, but it is especially dangerous to pregnant women and children, whose bodies absorb more of the neurotoxin.
The Trump administration delayed the detonation several times after it became clear that the government had not widely communicated its plans or the public health risks associated.
After growing public pressure, the Trump administration mobilized a whole-of-government response, enlisting the Environmental Protection Agency, the Federal Emergency Management Agency, the Centers for Disease Control, the National Weather Service, the Department of Energy and even two NASA aircraft.
The government also dramatically increased its efforts to reduce the possibility of a lead dust plume. On Monday night, the Army built a dam around the explosives designed to flood the area with water and foam just ahead of the explosion in an effort to weigh down and absorb any escaping lead dust.